water treatment chemical costs (or DOR setup special order costs)
water softener regenerated salts costs
Items included in the Steam lease cost
Rent for apparatus
periodic inspection costs
repair charge (inc. parts)
maintenance service costs
water treatment chemical costs
water softener regenerated salts costs
3.DOR lease system
4.Maintenance lease system
Oxygen reduction equipment DOR for standard treated water level over 1000 L/h
Miura's Z-brand product, apparatus and maintenance system combination specification
DOR lease cost/m3 or lowest standard price
DOR costs + maintenance related costs + maintenance management costs + fixed property tax + interest
Maintenance lease cost
Miura's Z-brand product and apparatus costs + maintenance related costs + fixed property tax + interest
Items included in DOR lease cost
First time test operation costs
lease costs and usage costs
periodic inspection costs
repair charge (inc. parts)
maintenance service costs
Items included in the maintenance lease cost
First time test operation costs
lease costs
periodic inspection costs
repair charge (inc. parts)
maintenance service costs
*Miura's Z-brand products and apparatus can also be individually leased through Miura lease.
Preventative safety through periodic maintenance checks
Miura Preventative Safety built on Miura's outstanding 30-year maintenance system history.
Our warranty also includes sudden part replacement.
There are no loan costs for main part expenses and repair costs. The customer does not bear the costs for unexpected damage during normal operation.
We also have a safe "leave it to us" type, with maintenance and management costs included.
For steam lease and steam rental, water treatment chemical costs and regenerated salt costs plus delivery or bring it/put it yourself services are included.